An 800 VDC bus can fall past half voltage in about half a millisecond, and most of the devices meant to isolate a fault take longer than that. We read the Open Compute Project documents side by side, did the arithmetic, and found two rack designs where we expected one, a standards gap at 60 V, and a fault number the white paper gives two ways.
The short answer is that inside an 800 VDC rack, the hard part is the stretch of time between a fault starting and something isolating it. The Open Compute Project's LVDC white paper describes two rack designs that handle that stretch very differently. In one, an e-fuse on each power supply takes several milliseconds and hold-up capacitors carry the bus meanwhile. In the other, a hot-swap circuit on each tray isolates in microseconds. By our arithmetic, covering a 5 millisecond e-fuse window at 100 kW takes about 33 times the capacitance per kilowatt that the SST specification proposes for its own output, and the white paper says all of that stored energy discharges into a fault on the bus. The standard that covers integrated e-fuses, UL 2367, has no explicit voltage restriction but does not address requirements for devices rated above 60 V.
We worked through it in six rounds. Each round begins with something a reasonable engineer would believe, raises the strongest doubt we could find, checks it against the white paper, the SST specification or the MGX 1.2 rack specification, and keeps only what survives. Where a number is our arithmetic or our assumption, we say so.
The scene that sets this up is a simulation, and it comes from the white paper's own fault study. An 800 VDC reference system is running fully energized, and one millisecond in, a server develops a bolted fault. Current into the fault rises at about 1 kA per microsecond, which the paper calls orders of magnitude faster than a comparable AC fault, and it peaks near 92 kA as the bus capacitors empty into it. The paper reports that the healthy pole voltage falls below 90 percent of nominal about 0.26 milliseconds after the fault starts and below half about 0.56 milliseconds after, reaching a minimum of about 60 V. The paper puts the clearing time of a conventional electromechanical DC breaker at several milliseconds. Every protection choice inside the rack is a choice about who acts inside that first millisecond, and who carries the load until they do.
Round 1: The 250 kW rack has already moved to 800 VDC
The belief. MGX 1.2 was published in October 2026 for racks of up to 250 kW, and 800 VDC is where the industry is heading, so the 250 kW rack must already be an 800 VDC rack. The questions in this article would then be questions about hardware that is shipping.
The doubt. A rack can draw 250 kW and still run its busbar at the old voltage. The specification would say which.
The evidence. The MGX 1.2 specification, effective 6 October 2026, says its busbar is 48 VDC nominal, with a range of 40 to 59.5 VDC, liquid cooled, and good for up to 5,000 A. It gives typical power shelf output voltages of 48, 51 or 54 V. The 250 kW figure appears in its table as maximum rack power dissipation, and power shelves are outside the specification's scope. So the 250 kW MGX rack is a 48 V rack with the 800 V question left to whatever feeds its power shelves.
The evidence. The arithmetic shows how close to the edge that busbar sits. At 5,000 A it carries 240 kW at 48 V, 200 kW at the bottom of its range and 297.5 kW at the top. A 250 kW rack at 48 V would draw about 5,208 A. The same rack at 800 V draws 312.5 A, which is a sixteenth of the current, and a 750 kW rack at 800 V draws 937.5 A, against 15,625 A at 48 V.
The evidence. The LVDC white paper is where 800 V goes inside the rack. It lists rack power levels for LVDC vertical distribution of 200 to 250 kW, 500 kW and 750 kW, and notes that higher power racks need higher current busbars that may be liquid cooled. It also gives the density case for removing a conversion stage, a 39 percent increase in power density per power shelf made possible in part by removing the AC to DC stage, and about 12 to 16 OU freed in systems that use in-rack storage.
What survived. The 250 kW rack exists, and its busbar runs at 48 V. Running 800 V up the rack is a design option the white paper describes for 200 kW and above, and it is the option where hot-swap, e-fuses and hold-up start to matter at 800 V instead of at 48 V. That is the hardware this article is about, and in the documents we read it is described as an option and not yet specified.
Round 2: There is one protection ladder inside the rack
The belief. The rack has a timing ladder. A hot-swap circuit isolates in microseconds, an e-fuse isolates in milliseconds, and hold-up capacitance covers the gap between them. Draw it once and every rack follows it.
The doubt. Our own first draft of this article drew exactly that ladder. When we went back to the white paper to cite each rung, the rungs came from two different sections describing two different racks.
The evidence. Section 9.2 describes a rack with an LVDC to ELVDC power shelf. The rack takes 800 V in, and a shelf of paralleled, galvanically isolated DC to DC supplies converts it to an extra low voltage such as 50 V for conventional trays. Each supply has its own e-fuse and inrush current limiter. The paper says the e-fuse needs several milliseconds to isolate a faulty supply, so hold-up capacitors at the LVDC input keep the bus from sagging badly in the meantime, and the shelf has to meet a hold-up time requirement in the several millisecond range. A capacitor shelf on the 50 V busbar buffers fast GPU load changes so they do not cause oscillations on the LVDC side or at the AC input of the upstream converter.
The evidence. Section 9.3 describes a rack with LVDC native trays. Here 800 V runs up a busbar to every tray, and each tray carries a fuse and a hot-swap circuit that limits inrush at start up, discharges the input capacitors at shut down, and handles fault monitoring, isolation and telemetry. The paper says that circuit typically isolates a fault within a few microseconds. A junction tray at the rack entry holds capacitors that damp oscillations caused by the parasitic inductance of the busway, and an optional capacitor bank unit steadies the bus against fast GPU load transients so they do not cause oscillations at the upstream converter's AC input.
What survived. There are two racks. In the shelf design the isolating device is slow and stored energy covers the wait. In the native tray design the isolating device is fast and the capacitors are there mostly for damping and for load transients. A designer picks one, and the size and purpose of every capacitor follows from that choice. Mixing rungs from both gives a ladder no real rack has.
Round 3: Hold-up capacitance is a small add-on
The belief. Hold-up only has to cover a few milliseconds, so a modest bank at the shelf input should do, and it costs little more than board space.
The doubt. A few milliseconds at a hundred kilowatts is a lot of joules, and the white paper's own fault study says that stored energy does not stay politely on the healthy side of a fault.
The evidence. The capacitance needed to carry a constant power load for a time t while the bus sags from V1 to V2 is twice the power times the time, divided by the difference of the squares of the two voltages. We assumed a 100 kW shelf on an 800 V bus. To cover 5 milliseconds with the bus allowed to sag 10 percent, to 720 V, takes about 8.2 mF, which stores about 2.6 kJ at 800 V. Covering 2 milliseconds takes about 3.3 mF. If the bus may sag 20 percent, to 640 V, the figures drop to about 4.3 mF for 5 milliseconds and 1.7 mF for 2 milliseconds. The white paper says several milliseconds and does not give the sag the shelf may accept, so these are our assumptions, and the shape of the answer matters more than the third digit.
The evidence. The SST specification gives the one published anchor we found for capacitance on the 800 V bus. Revision 0.3.0, section 4.3, lists the output DC link capacitor size as a maximum of 10 mF per 4 MW output, marked TBD and to be fine tuned after full LVDC system simulation and testing. Scaled to 100 kW, that recommended maximum is 0.25 mF. A shelf covering a 5 millisecond e-fuse window at 10 percent sag holds about 33 times that per kilowatt, and even the lightest case above, 1 millisecond at 20 percent sag, holds about 3.5 times as much.
The evidence. Then comes the cost on the fault side. The white paper's section 7.2 says that in a fault all energy storage devices will discharge into the fault location, that the peak current is set by the local capacitor discharge, and that this discharge peak can be too narrow to trigger the magnetic protection of a conventional breaker. A hold-up bank sized to carry 100 kW for 5 milliseconds is also a bank that can push a large, short pulse into a fault upstream of it.
What survived. Hold-up capacitance is the main design decision in the shelf design, because it trades ride-through against fault energy. Size it from the real isolation time of the device it covers and the sag the downstream converters can actually accept. Treat the SST figure as what it says it is, a recommended maximum still to be fine tuned, and expect the rack and the converter feeding it to hold very different amounts of capacitance per kilowatt.
Hold-up inside the rack covers milliseconds, while riding through a dip on the grid is a separate requirement on a much longer clock.
Round 4: A fault in the next rack lasts a few hundred microseconds, so ride through it
The belief. The white paper's transient levels tell the load what to tolerate. Transient Level 2 covers a dip of a few hundred microseconds, such as a short circuit in a nearby compute rack, and the converter has to ride through it without tripping on overcurrent or undervoltage. Meet that and a neighbor's fault is not your problem.
The doubt. A dip only lasts a few hundred microseconds if something upstream clears the fault in a few hundred microseconds. The level describes the load's side of the bargain, so we went looking for the protection that would hold up the other side.
The evidence. The white paper defines four operating levels for converters on the 800 V bus. Continuous operation means running indefinitely without tripping on overcurrent or overtemperature. Transient Level 1 is a few tens of milliseconds without tripping and without performance degradation, tied to a fuse opening on the data center's LVDC distribution. Transient Level 2 is the few hundred microsecond dip described above. Transient Level 3 has two cases, a surge of tens of microseconds that protection devices are expected to clamp, and a dropout during which the unit must hold up its outputs from its own stored energy, with performance degradation allowed. The paper notes that a conversion shelf can support longer dropouts than a single supply because it has more volume. The voltage limits for each level are drawn in the paper's Figure 9.5, and we did not take numbers off a drawing.
The evidence. Now the clearing times the same paper gives. Solid state circuit breakers clear in 10 to 25 microseconds in one section, and another section describes protection by an SSCB clearing the fault in 50 microseconds. Hybrid breakers, which add mechanical bypass contacts to cut losses, take hundreds of microseconds. E-fuses on the shelf supplies take several milliseconds, and conventional electromechanical DC breakers take several milliseconds. Set those against the reference fault, where the healthy pole voltage fell below half in about 0.56 milliseconds.
The evidence. The fault current tells the same story. At the initial rate of about 1 kA per microsecond, current climbs about 10 kA in 10 microseconds, 25 kA in 25 and 50 kA in 50. The paper names the highest rate of current rise a solid state breaker can interrupt as its key rating. If the full 800 V sat across the loop, that rate would mean a loop inductance of about 0.8 microhenries, which by our inference is the same order as the 0.4 microhenries the paper's table gives for 2 meters of cable from the PSU bus to a server.
The doubt. The paper's fault study also disagrees with itself on one number. For the faulted server with fault feeding converters at steady state, the text says the fault settles near 85 kA, and adds up three contributions, about 27 kA from the source bus, about 33 kA from the three healthy load buses and about 24 kA from the faulted bus's own storage. The caption of Figure 7.6 says the fault feeding design holds about 41 kA. The three contributions in the text add to 84 kA, which supports the text, but we cannot tell from the document which value the authors intended, and we would not size anything on either until the next revision says.
What survived. Transient Level 2 only holds if the fault upstream is cleared by solid state or hybrid protection. With e-fuses or electromechanical breakers between the fault and the rack, the neighbor's dip lasts milliseconds, and in the reference study the bus is past half voltage before a millisecond device can act. That is our reading of the paper, which does not connect the two sections itself. In practice, Level 2 tells you what the protection upstream has to do as much as what the load has to survive.
Round 5: An e-fuse is a listed protective device
The belief. E-fuses are everywhere in 48 V and 12 V hardware, they carry listings, and an 800 V e-fuse on each shelf supply is the same idea at a higher voltage.
The doubt. Listings have scopes. We checked whether the scope reaches 800 V.
The evidence. The white paper's section 7.2.5.3 groups solid state circuit breakers, hybrid breakers and e-fuses. It says e-fuses have breaking times similar to solid state breakers, can be reset, and have no isolation contacts, and that under NFPA 70 they count as supplementary protection only. Integrated circuit e-fuses are covered by UL 2367 and by subclause G.9 of IEC 62368-1, and the paper gives that coverage as 5 A and 250 VA. It notes that UL 2367 has no explicit voltage restriction, and then says plainly that it does not address requirements for devices rated above 60 V. It adds that removing the 5 A limit in a new edition of the standard is under discussion. Section 8.5 adds that, at the time of writing, UL 891 for switchboards and UL 67 for panelboards do not allow a rated voltage above 1000 Vdc.
The evidence. The arithmetic puts the gap in perspective. At 60 V, 250 VA is about 4.2 A. At 800 V the same 250 VA is reached at about 0.31 A, and 800 V is about 13 times the 60 V above which the standard's requirements stop. An e-fuse protecting a supply on an 800 V shelf is beyond the voltage the standard's requirements address before power or current even come into it, and that holds even if the 5 A limit is removed.
What survived. At 800 V, an e-fuse is supplementary protection with no listing route that the white paper can point to. That is a reason to design and test it seriously, because there is no listing to lean on. The test conditions, voltage, current, rate of rise and number of operations become evidence the designer has to produce, and the branch circuit protection still has to come from something else.
Round 6: Hot-swap is a connector with a soft start
The belief. Hot-swap means a tray can be plugged into a live bus without a bang, and a current limited soft start handles that. Above that it is a mechanical question about the connector.
The doubt. At 54 V that may be fair. At 800 V the energy that flows on insertion and the order in which contacts meet both change.
The evidence. The white paper's section 9.5 is the most detailed part of the document on this. The tray connector has three contact groups, power, pre-charge and presence. The hot-swap controller acts as a controlled current source that charges the input decoupling and bulk capacitors, and it also gives fast overcurrent protection. Even without a controller or an input filter, there is an initial inrush from the parasitic capacitance of wiring, boards, transistors and protection devices, lasting about 1 to 3 microseconds and often above 30 A. The paper recommends handling it with a longer pre-charge pin and a current limiting device such as a resistor, and leaves the evaluation to the implementer. It recommends keeping the bulk capacitor charging current below the tray's nominal operating current to limit stress on the pass device. It asks for a discharge circuit that brings the bulk capacitors to a safe voltage within the time set by safety standards, without naming a number, and recommends feeding the auxiliary supply from the main input ahead of the hot-swap controller, so the controller and microcontroller stay powered through a failure. Section 7.4 notes the risk of arcs from hot swapping modules.
The evidence. The arithmetic on the pass device is simple and unforgiving. When a controller charges a capacitor at constant current, the energy lost in the pass device equals the energy that ends up stored, half of C times V squared, whatever the current. For each 100 microfarads of bulk capacitance, that is about 0.15 J at 54 V, 8 J at 400 V and 32 J at 800 V. The 800 V figure is about 219 times the 54 V figure for the same capacitance. If the charging current equals a 10 kW tray's nominal current at 800 V, which is 12.5 A, the 100 microfarads charge in about 6.4 milliseconds, and the pass device averages about 5 kW while it does, because the average voltage across it is half the bus. The 100 microfarads and the 10 kW tray are our assumptions for scale.
What survived. Hot-swap at 800 V is an energy problem in the pass device and a sequencing problem in the connector, and the white paper gives the order of things more firmly than the numbers. Pre-charge pin length, the inrush limit, the discharge time and the behavior of the auxiliary supply during a failure are all left to the implementer. They belong in the tray's specification and in its test plan.
What we would put in a design basis
- State which rack design you are building, the 9.2 power shelf design or the 9.3 native tray design, and size every capacitor for its job in that design: hold-up, damping or load transients.
- Size hold-up capacitance from the measured isolation time of the device it covers and from the sag the downstream converters accept, and record the fault current that bank adds alongside it.
- Treat the SST specification's maximum of 10 mF per 4 MW as a recommended value still to be fine tuned, and ask the converter supplier in writing how it interacts with the capacitance in the racks it feeds.
- Write down which upstream device clears a fault in a neighboring rack, and its clearing time and rate of rise rating, before claiming Transient Level 2.
- For every e-fuse above 60 V, record the test voltage, current, rate of rise and number of operations, and name the device that provides branch circuit protection.
- Specify the pre-charge pin, the inrush limit, the pass device energy at full bus voltage, the discharge time and the auxiliary supply behavior for each tray.
- Plan fault recording at a speed that sees the events above. The white paper's section on DC fault transient recorders gives solid state breakers 10 to 25 microseconds to clear and says recorders need MHz level sampling.
What to watch through the next two years
- The next revision of the LVDC white paper, which may settle the 85 kA and 41 kA difference in section 7.2.1 and put numbers on the transient level voltage limits and on the hot-swap items section 9.5 leaves to the implementer.
- The next revision of the SST specification and its output DC link capacitance, now a maximum of 10 mF per 4 MW marked TBD pending full LVDC system simulation and testing.
- The new edition of UL 2367, where the white paper says removing the 5 A limit is under discussion, and whether that edition or any other requirement addresses solid state protective devices above 60 V.
- Any change to the 1000 Vdc ceiling in UL 891 and UL 67.
- Whether a later MGX revision moves the rack busbar from 48 V to LVDC, or keeps 800 V outside the rack and in front of the power shelves.
- NERC's CLO-003-1, filed with FERC on 16 November 2026, which covers protection coordination and disturbance monitoring for computational loads. If FERC approves it, its recording requirements will set how much of a rack level event anyone can see afterward.
The six rounds at a glance
| Round | The belief | What the evidence showed | What survived |
|---|---|---|---|
| 1 | The 250 kW rack is already 800 VDC | MGX 1.2 uses a 48 VDC busbar at up to 5,000 A | 800 V inside the rack is still mostly a white paper design |
| 2 | There is one protection ladder | E-fuse with hold-up is section 9.2, microsecond hot-swap is section 9.3 | Two rack designs with different capacitor jobs |
| 3 | Hold-up is a small add-on | About 8.2 mF per 100 kW for 5 ms at 10 percent sag, 33 times the SST figure per kW | Hold-up trades ride-through against fault energy |
| 4 | A neighbor's fault is a few hundred microseconds | The bus passes half voltage in 0.56 ms, and only solid state or hybrid devices clear that fast | Level 2 is a requirement on upstream protection too |
| 5 | An e-fuse is a listed device | UL 2367 does not address requirements above 60 V, and covers 5 A and 250 VA | At 800 V the test evidence is the designer's |
| 6 | Hot-swap is a soft start | 32 J in the pass device per 100 microfarads at 800 V, 219 times the 54 V figure | Pre-charge, inrush, discharge and auxiliary supply all need specifying |
Frequently asked questions
What does an e-fuse do in an 800 VDC rack?
In the power shelf design in the OCP LVDC white paper, each paralleled DC to DC supply has its own e-fuse and inrush limiter, so a faulty supply can be isolated on its own. The paper says the e-fuse needs several milliseconds to isolate the fault, and hold-up capacitors at the shelf input carry the bus during that time. Under NFPA 70 an e-fuse counts as supplementary protection only.
Why does an 800 VDC rack need hold-up capacitors?
They carry the load while a slower protective device, such as a several millisecond e-fuse, isolates a fault, so the shared bus does not sag badly. By our arithmetic, carrying 100 kW for 5 milliseconds with a 10 percent sag takes about 8.2 mF. The same capacitors discharge into any fault upstream of them, so their size is a trade against fault energy.
Does UL 2367 cover e-fuses at 800 VDC?
No. The OCP LVDC white paper says integrated circuit e-fuses are covered by UL 2367 and IEC 62368-1 subclause G.9 up to 5 A and 250 VA, and that UL 2367 has no explicit voltage restriction but does not address requirements for devices rated above 60 V. At 800 V, test evidence has to come from the designer.
Is the 250 kW MGX 1.2 rack an 800 VDC rack?
No. The MGX 1.2 specification, effective 6 October 2026, describes a 48 VDC nominal busbar with a range of 40 to 59.5 VDC and a rating of up to 5,000 A, and lists 250 kW as maximum rack power dissipation. 800 V inside the rack is a design option described in the OCP LVDC white paper for racks of 200 kW and above.
How fast does protection have to act on an 800 VDC bus?
In the OCP LVDC white paper's reference fault, current rose at about 1 kA per microsecond and the healthy pole voltage fell below half in about 0.56 milliseconds. The same paper gives solid state breakers 10 to 25 microseconds, hybrid breakers hundreds of microseconds, and e-fuses and electromechanical breakers several milliseconds. Only the fastest of these act before the bus collapses in that study.
The arithmetic is ours and first order, and the assumptions are stated where they are used. The OCP documents cited are a white paper and draft specifications that are still being revised, so check the current versions before relying on a number here.
References: Open Compute Project, Data Center Facility: Low Voltage DC Power Distribution, white paper version 1.1.0 (2 September 2026) · Open Compute Project, Solid State Transformer (SST) Specification, Revision 0.3.0 (effective 22 June 2026) · Open Compute Project, MGX Accelerated Computing Rack and Trays Design Specification, Revision 1.2.0 (effective 6 October 2026) · NERC, Large Loads Action Plan (filing of CLO-001-1, CLO-002-1 and CLO-003-1, 16 November 2026).